Maximum efficiency is assured when PALFINGER Railway Systems are used in combination.
INSULATOR REPLACEMENT
Easy installation of an insulator unit through the combined operation of a PALFINGER access platform and a PALFINGER crane. The perfect complete package enables the greatest possible reach and maximum safety thanks to real-time, geometry-based, combined stability control.
REPAIR OF OVERHEAD LINE BRACKETS
The combination of a positioner and crane with a workman basket allows work on overhead line sections to be performed easily and efficiently.
MINIMAL DOWNTIME DURING EMERGENCY INTERVENTION
Quick and easy rectification of faults thanks to the use of perfectly matched products.
Contact
Christian Prantl
PALFINGER EUROPE GmbH
Moosmühlstr. 1 | 5203 Köstendorf | Austria